DAY 1- The Barge Arrives 10/24/07 |
|
 Looks odd for something so large to be next to the dock |
Ready to Begin
|
DAY 2 The Barge Moves Into Place |
 Steel bars are put through the
Boat House for lifting
|
 Still more supports for the house are needed |
DAY 3- Time to Move the Boat House |
 Crane moves into place |
UP
|
 UP |
AND AWAY!!
|
DAY 4- Taking down the Dock |
 Planks begin to come down |
 Then the pilings...Going |
 Going |
Gone
|
DAY 5
The old wood planks and pilings gathered on the barge make their way down the river to
Wye Landing for off loading, and loading up of the new dock material
|
DAY 6--New pilings going in 10/31/07 |
Pile driving
|
More piles for this new dock! |
Day 7- More Pile Driving |
 Second row of pilings |
 Floating Boat House, never in the same spot. |
Day 8- Pile driving |
 Pilings for the Boat House go in, an yes it IS loud
|
 Boat House getting glimpse of creek from different angles |
Day 9- Shaping Up |
 Pilings are not pounded in, but vibrated in. |
 We trust there will be more boards when it is done. |
Day 10- Coming together |
 Adjusting piling height
|
 We'll find out soon why the pilings are shapped this way...
|
Day 11- Making it Level |
|
|
Day 12-Lower Decking |
 Decking supports go in
|
 Future home of the boat house... a bit more sturdy than before
|
Day 17- Decking Begins |
 Decking on first part almost done |
 Finally, possibly to stand over water again! |
Day 18- Decking almost complete |
|
|
Day 20-The Boat House Flys Back On-- Only 20 days after the project begins!! |
|
|
|
|
|
|
COMING SOON--After the finishing touches, a paint job, refinished roof and the fixing of a few shingles---
Photos of the completed Dock |
| |
|