photoPhotoBar
A Sanctuary of Chesapeake Audubon Society
Out with the old (dock) In with the new!
DAY 1- The Barge Arrives 10/24/07
1
3 Looks odd for something so large to be next to the dock

2Ready to Begin

DAY 2 The Barge Moves Into Place
4 Steel bars are put through the Boat House for lifting
5Still more supports for the house are needed
DAY 3- Time to Move the Boat House
6Crane moves into place

7UP

8 UP

9AND AWAY!!

DAY 4- Taking down the Dock
10Planks begin to come down
11Then the pilings...Going
12Going

13Gone

DAY 5
The old wood planks and pilings gathered on the barge make their way down the river to
Wye Landing for off loading, and loading up of the new dock material

DAY 6--New pilings going in 10/31/07

Pile driving

More piles for this new dock!

Day 7- More Pile Driving
Second row of pilings
Floating Boat House, never in the same spot.
Day 8- Pile driving
Pilings for the Boat House go in, an yes it IS loud
Boat House getting glimpse of creek from different angles
Day 9- Shaping Up
Pilings are not pounded in, but vibrated in.
We trust there will be more boards when it is done.
Day 10- Coming together
Adjusting piling height
We'll find out soon why the pilings are shapped this way...
Day 11- Making it Level
Day 12-Lower Decking
Decking supports go in
Future home of the boat house... a bit more sturdy than before
Day 17- Decking Begins
Decking on first part almost done
Finally, possibly to stand over water again!
Day 18- Decking almost complete
Day 20-The Boat House Flys Back On-- Only 20 days after the project begins!!
COMING SOON--After the finishing touches, a paint job, refinished roof and the fixing of a few shingles---
Photos of the completed Dock
   
Bay Gateways logo

We are a proud participant of Cheasapeake Bay Gateways Network
11450 Audubon Lane
Easton, MD 21601
410-822-4903/410-822-5041fax)

Created by Susanna Scallion Last Updated 10/07
Copyright 2007 by Pickering Creek Audubon Center. All rights reserved.